1.Chemical reactor’s control system for polymers production, S7-1500, Wonderware Platform.2016
2.Control system for dosing of Dispal, S7-315.2016
3.Supply and control system for zinc coating furnace, S7-1200, TP-1500, WinCC Flexible.2016
4.Control and visualisation for air conditioning and ventilation systems in ceramics’ new production hall, S7-315, WinCC, TP1500.2016
5.Control system for brewing liquor, S7-1200, WinCC Flexible.2016
6.Modernization of palletizer – migration S5 to S7, S7314.2016
7.Media visualization on a video wall for car manufacturing plant, S7315, WinCC.2015
8.Control system for palletizing line, S7-1200, WinCC.2015
9.Control system for pump cascade, S7-1200.2015
10.Control system for chemical reactor, S7-1500F.2015
11.Automation system for cooling tower, S7-1200 WinCC Flexible.2015
12.Cascade pomp control system for automotive plant, S7-315, WinCC.2015
13.Modernization of packing line, S7-313, WinCC Flexible.2015
14.Control system modernization with migration: Simatic S5 to S7 for CiP station brewery, S7-315, WinCC.2015
15.Frequency converters installation, PLC and HMI software update for HVAC system in automotive plant, S7-400, WinCC.2014
16.Software design for crushing plant including unloading system, S7315, WinCC.2014
17.RGHTC switchgear  automation implementation to the central visualization system.2014
18.InBatch production control system for Ftalowe Paints Department, based on Wonderware Platform, S7-417.2014
19.Device integration and P1 and B3 filling line data concentration for MES system, S7-414.2014
20.Modernisation of pulp node and hydrotransport control system, S7-3152DP.2014
21.Control and visualization for ventilation system – P1, P2, BBT Halls; S7315, WinCC.2014
22.Pump cascade system with control and visualization, S7315, WinCC.2014
23.A special water cascading system for the new production plant, S7315, WinCC.2014
24.InBatch production control system for Ftalowe Paints Department, based on Wonderware Platform and PLC Siemens S7-416.2014
25.Multi-pump cascading PWP drive system.
26.Implementation of BMS central system, monitoring, visualization as well as plant’s security and media consumption data reports, Wonderware Platform.2014
27.Control system for pallet transport with completed product from production division to MWG warehouse, S7-3152DP, TP Siemens.2013
28.Control system for Pallet Transport, S7-313.2013
29.Software preparation and batch production control system start-up on Wonderware InBatch platform for Chlorokauczuki Production Department along with switch boxes prefabrication and installation, S7-416, Wonderware Platform.2013
30.Ventilation control and visualization system – B3 production hall, S73152DP, WinCC.2013
31.Ventilation control and visualization system – B4 production hall, S73152DP, WinCC.2013
32.Control and visualization for ventilation system – warehouse, S73152DP, WinCC.2013
33.Modernisation of T13 conveyor belt carrying coal along with Danfoss 75kW frequency converter integration and commissioning.2013
34.The supply and start-up of switchgear with 400kW frequency converter to supply the car glasses heat up fan.2013
35.Modernisation of 45kW fans control – inverters and switch boxes supply and installation + power cables replacement.2013
36.The palletizing line PLC S7-300 controller software.2012
37.The palletizing line automation system.2012
38.The glycol cold store control system, PLC S7-1200.2012
39.Preparation of heat recovery wheels power cubicle for Belchatow Power Plant power generating unit’s modernised BB-1150 boiler.2012
40.Production of carbon filter control system in the syrup manufacturing plant – electrical part + IT systems – S7300.2012
41.SUW area carbon filter modernisation, S7-300.2012
42.TK01 water tank automation – the supply and installation of automatics elements, electric installation, pneumatic, software, visualization in PCS7v6 infrastructure system.2012
43.Complete control system preparation for softened water pumping modernisation S7-315.2012
44.Optimisation of palletizing line conveyor module – software S7 and VLT.2012
45.Acid tanks control and visualization systems, S73152DP, WinCC.2012
46.The supply and start-up of power supply and control system for collagen casings production line.2011
47.Modernisation of Hot Gases Fan drive system. The supply, installation and start-up of fan power and control systems with engine and 315kW frequency converter.2011
48.Building Epichlorohydric from glycerol installation production. The supply of switchgears with 110kW frequency converters – S7 software and operating panels.2011
49.The complex deoxygenated water pump system in the bottler building, S7300.2011
50.The supply of power and control cubicle for syrup manufacturing plant – Line L1, S7-3152DP.2011
51.Ventilation control system for brewery storage facilities – S7300 system and visualisation on WinCC.2011
52.Dehumidifiers control systems – filling line modernisation – software S5, S7, visualisation correction on panels (Protool), WinCC, supply, installation and Danfoss drives start-up, complex cabling.2011
53.The renovation of palletisers and depalletisers – filling line, drives replacement, S7 software correction.2011
54.Buckets with paint positioning system for pallet transporter.2010
55.250kW fan drive system modernisation. Celma engines (2 units), Danfoss inverters (2 units) supply and start-up along with electrical system.2010
56.The supply and start-up of switchgears with 400 kW switchgears (3 units) to supply and control the fans cascade.2010
57.Vacum pump drive modernisation along with Danfoss VLT 3000 frequency converter replacement for FC-302P30K.2010
58.Preparation of heat recovery wheels 4 power cabinets for Belchatow Power Plant.2009
59.The supply of switchgears (8 units) for the underground garage automation and ventilation installations.2009
60.The supply, installation and start-up of tank level control system in filtration buffer tank along with beer delivery to TKF pump drive system modernisation.2009
61.The power and control cubicle for two pumps: supply, installation and commissioning.2009
62.The supply, installation and commissioning  of Danfoss frequency converters (25 units 75 kW).2008
63.Power and control system for rotary furnaces and dedusters.2008
64.The supply of switchgears with Danfoss 75 frequency converters and 250 kW for fans drives.2008
65.Tank pressure control system completion.2008
66.The supply and start-up of 2x 250 kW fans drive system with power quality convertor.2008
67.The complex plant modernisation – 75 kW electric fans drives automation, agitators, conveyor belts, switchgears supply and installation.2008
68.Switchgears preparation to control three 132 kW pumps, one 37 kW pump as well as two 92 kW pumps and one 26 kW pump.2007
69.The control system and drive’s preparation, stove circuit pumps (2 units) with frequency converters (engines: 75 and 200 kW, voltage 500 V).2007
70.Modernisation of hot water pump control system in Huppmann brew-house.2007
71.The supply, installation and start-up of Danfoss 6062 frequency converters (20 units 45 kW) for fan drives.2006
72.Preparation and commissioning of cold water control system for boiler room.2005
73.BBT tanks pressure control system preparation along with installation and start-up.2004
  • short

    ON MARKET

    SINCE 2001

  • short

    ONLY

    THE HIGHEST
    QUALITY

  • short

    LeaDER

    AMONG
    DISTRIBUTORS

  • short

    24/7

    TECHNICAL SUPPORT
    Warranty